Projects underway and completed, for government and semi-government entities in Saudi Arabia and Egypt.
Construction of 6 sewage lift stations with excavation depths of 9–11 meters, alongside trenchless pipeline works using pipe jacking and microtunneling techniques. Pipe jacking diameters of 600–1000mm (steel casing) and 400–800mm (HDPE), with a jacking shaft of 10×5m, 8.5m depth, and 500-ton capacity. Full civil, mechanical, and electromechanical scope per NWC specifications.

A tertiary wastewater treatment plant to enhance treatment efficiency and support water reuse, including civil and electromechanical works.

Rehabilitation and commissioning of a strategic water facility, including structural, mechanical, and electrical upgrades.

A unified electrical contract covering a wide range of electrical infrastructure works based on periodically issued work orders.

A large-scale integrated infrastructure and landscaping project covering essential utility networks and external works.

Execution of a fully integrated residential compound delivered as a turnkey project, with high standards in civil, architectural, and finishing works.